{"id":8636,"date":"2026-07-27T11:07:15","date_gmt":"2026-07-27T03:07:15","guid":{"rendered":"https:\/\/www.jodoo.com\/blog\/?p=8636"},"modified":"2026-07-27T16:39:21","modified_gmt":"2026-07-27T08:39:21","slug":"risk-assessment-tools-manufacturing","status":"publish","type":"post","link":"https:\/\/www.jodoo.com\/blog\/de-de\/risk-assessment-tools-manufacturing","title":{"rendered":"Die wichtigsten Risikobewertungsinstrumente f\u00fcr die Fertigung: Wie man sie ausw\u00e4hlt und anwendet"},"content":{"rendered":"<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"introduction-why-risk-assessment-tools-matter-in-manufacturing\"><\/span>Introduction: Why Risk Assessment Tools Matter in Manufacturing<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A single missed hazard can stop a line, injure a worker, or trigger a costly compliance failure. According to the International Labour Organization, nearly 3 million work-related deaths occur globally each year, with hundreds of millions more non-fatal incidents affecting productivity, quality, and workforce stability. In manufacturing, that risk is rarely caused by one dramatic event alone. More often, it comes from routine tasks that were never assessed consistently across shifts, lines, or sites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why <strong><a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\">risk assessment tools<\/a><\/strong> matter. In a plant environment, they give <strong><a href=\"https:\/\/www.jodoo.com\/blog\/ehs-manufacturing-guide\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\">EHS<\/a><\/strong> managers and production leaders a practical way to identify hazards, rate severity and likelihood, and decide which controls need action first. Without a repeatable method, teams often rely on individual judgment, paper forms, or outdated spreadsheets, which makes prioritization inconsistent and follow-up weak.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article breaks down the main risk assessment methods used in manufacturing, including when to use a risk matrix, a What-If review, or a Bowtie analysis. It also explains how to score hazards in a manufacturing risk matrix and how to choose a tool that fits real shop-floor workflows, documentation needs, and corrective action processes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"the-main-types-of-risk-assessment-methods-used-in-manufacturing\"><\/span>The Main Types of Risk Assessment Methods Used in Manufacturing<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturers use several types of risk assessment methods because not every hazard needs the same level of analysis. A routine machine guarding review, a chemical unloading operation, and a new automated cell startup each create different questions, data needs, and decision speeds. In practice, the best approach is to match the method to the problem, then standardize when and how each tool is used.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The three core methods covered here differ in purpose and output. A <strong>risk matrix<\/strong> helps teams score hazards quickly and prioritize action, a <strong>bowtie analysis<\/strong> maps causes and consequences around a critical event, and a <strong>what-if analysis<\/strong> tests scenarios by asking structured questions about failure, deviation, or human error. That distinction matters when you are deciding how to choose a risk assessment tool for daily operations versus major process changes.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-88-1.png\" alt=\"Comparison infographic of risk matrix, bowtie analysis, and what-if analysis for manufacturing risk assessment tools\" class=\"wp-image-8747\" srcset=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-88-1.png 1536w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-88-1-300x200.png 300w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-88-1-1024x683.png 1024w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-88-1-768x512.png 768w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-88-1-18x12.png 18w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"risk-matrix\"><\/span>Risk Matrix<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A risk matrix is the most widely used option for general manufacturing because it is fast, easy to teach, and practical for frontline supervisors. It combines <strong>likelihood<\/strong> Und <strong>Schwere<\/strong> into a simple score so teams can rank hazards and decide which ones need immediate control. This is especially useful for routine inspections, permit reviews, contractor work, and shift-level safety checks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, a food packaging plant reviewing manual pallet movement can score collision risk, ergonomic strain, and pedestrian exposure within one short assessment. The output is a prioritized list rather than a deep causal map, which makes the method suitable for high-volume, repeatable decisions. It also supports comparisons across departments if the scoring criteria are consistent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Its main limitation is oversimplification. If scoring definitions are vague, two supervisors may rate the same hazard differently, which weakens trend reporting and auditability. That is why using a risk matrix in manufacturing works best when the plant has clear scoring rules, action thresholds, and reviewer guidance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"bowtie-analysis\"><\/span>Bowtie Analysis<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Bowtie analysis works best for <strong>low-frequency<\/strong> but <strong>high-consequence<\/strong> events where leadership needs to understand barrier effectiveness. Instead of only scoring risk, it centers on one top event, then maps the <strong>threats<\/strong> that could cause it and the <strong>consequences<\/strong> that could follow if controls fail. It also shows preventive and recovery barriers in one visual structure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A chemical blending plant might use a bowtie for solvent vapor release in a mixing area. The analysis can show ignition sources, ventilation failure, operator error, gas detection, emergency shutdown, and evacuation controls in a format that both EHS and production can review. This makes bowtie especially useful for process safety, hazardous energy, confined spaces, and major environmental incidents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The trade-off is effort. Bowties take more preparation than a matrix and are less practical for daily shop-floor hazard reviews. They are strong for critical-risk governance, but not efficient as the only method for all assessments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"what-if-analysis\"><\/span>What-If Analysis<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A what-if analysis is useful when conditions are changing, and the team needs to test <strong>uncertainty<\/strong>. It asks questions such as, \u201cWhat if the line restarts with a sensor bypassed?\u201d or \u201cWhat if a forklift enters the maintenance zone during setup?\u201d This approach is common during layout changes, equipment modification, startup planning, and non-routine tasks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Its strength is flexibility, especially when cross-functional teams need to surface failure modes quickly without building a full formal study. The limitation is that quality depends heavily on team experience and facilitation. If the right people are not in the room, important scenarios may be missed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"where-fmea-and-checklists-fit\"><\/span>Where FMEA and Checklists Fit<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">FMEA and checklists often complement, rather than replace, these core <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>risk assessment tools<\/strong><\/a>. <strong>FMEA<\/strong> is valuable when engineering teams need to analyze failure modes in products, tooling, or processes before problems reach production, while <strong>checklists<\/strong> help standardize recurring inspections and confirm basic controls are present. Most plants get better results by combining methods instead of forcing one tool onto every risk.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"using-a-risk-matrix-in-manufacturing-how-to-score-and-prioritize-hazards\"><\/span>Using a Risk Matrix in Manufacturing: How to Score and Prioritize Hazards<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A risk matrix is useful because it gives supervisors one consistent way to compare unlike hazards and decide what needs action first. In practice, you are translating field observations into a score that production, maintenance, and EHS can all read the same way. This matters when several issues compete for attention during a shift, from a missing machine guard to congested forklift lanes or poor chemical storage. Among the types of risk assessment methods used in plants, the matrix is often the fastest tool for day-to-day prioritization.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"define-severity-and-likelihood-clearly\"><\/span>Define Severity and Likelihood Clearly<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Start by setting a severity scale that fits your operation. A common <strong>1-to-5 scale<\/strong> works well: <strong>1<\/strong> for negligible injury or no production impact, <strong>3<\/strong> for recordable injury or moderate downtime, and <strong>5<\/strong> for fatality, permanent disability, major fire, or extended line stoppage. Keep the wording specific enough that two supervisors would rate the same event similarly. If definitions are vague, the score becomes subjective and hard to defend in audits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Next, define likelihood using actual exposure and operating conditions, not opinion alone. For example, <strong>1<\/strong> may mean rare or highly unlikely, <strong>3<\/strong> may mean possible during normal operations, and <strong>5<\/strong> may mean expected to occur frequently without additional controls. In manufacturing, likelihood should reflect factors such as task frequency, operator behavior, shift congestion, equipment condition, and whether controls are already failing. This is where using a risk matrix in manufacturing becomes more disciplined than a simple checklist.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"build-the-matrix-and-calculate-the-score\"><\/span>Build the Matrix and Calculate the Score<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once both scales are fixed, place likelihood on one axis and severity on the other to create a <strong>5&#215;5 grid<\/strong>. The basic risk score is calculated by multiplying the two numbers, so a hazard rated <strong>4 for severity<\/strong> Und <strong>3 for likelihood<\/strong> produces a score of <strong>12<\/strong>. That simple structure lets teams compare very different risks using the same logic. It also supports faster handoffs between line supervisors and EHS because the scoring method is visible and repeatable.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-91-1.png\" alt=\"5x5 manufacturing risk matrix showing severity, likelihood, and a machine guard hazard scored at 16\" class=\"wp-image-8748\" srcset=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-91-1.png 1536w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-91-1-300x200.png 300w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-91-1-1024x683.png 1024w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-91-1-768x512.png 768w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-91-1-18x12.png 18w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Use one running example to keep decisions consistent. Imagine a packaging line where an interlocked guard on a carton erector is being bypassed during jam clearing. Because contact with moving parts could cause serious hand injury or amputation, the supervisor rates severity at <strong>4<\/strong>. Since jam clearing happens several times per shift and the bypass is already occurring, likelihood is rated <strong>4<\/strong>, giving a risk score of <strong>16<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"set-action-thresholds-before-you-score\"><\/span>Set Action Thresholds Before You Score<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The matrix only works if score bands trigger predefined actions. A common model is <strong>1-5 low risk<\/strong>, <strong>6-10 moderate<\/strong>, <strong>12-15 high<\/strong>, Und <strong>16-25 critical<\/strong>, though plants should align thresholds with their own standards. Low-risk items may be monitored, moderate items scheduled, high-risk items corrected quickly, and critical items escalated immediately with temporary stoppage if needed. This is also a practical checkpoint when thinking about how to choose a risk assessment tool later: the tool must support clear thresholds, not just data entry.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"510\" src=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/Snipaste_2026-07-24_15-09-12-1024x510.png\" alt=\"\" class=\"wp-image-8692\" srcset=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/Snipaste_2026-07-24_15-09-12-1024x510.png 1024w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/Snipaste_2026-07-24_15-09-12-300x149.png 300w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/Snipaste_2026-07-24_15-09-12-768x382.png 768w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/Snipaste_2026-07-24_15-09-12-1536x765.png 1536w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/Snipaste_2026-07-24_15-09-12-2048x1020.png 2048w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/Snipaste_2026-07-24_15-09-12-18x9.png 18w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">In the packaging-line example, a score of 16 means the machine should not keep running under normal production pressure while waiting for the weekly safety meeting. Immediate controls might include locking out the equipment for repair, assigning maintenance response, and briefing operators on the temporary restriction. By contrast, a forklift blind corner rated 3 x 3 = 9 may justify barriers and traffic repainting within a scheduled window, while a poorly labeled chemical transfer point rated 5 x 2 = 10 may require faster action because consequence remains severe. The value of the matrix is not mathematical precision; it is consistent, fast prioritization.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"how-to-choose-a-risk-assessment-tool-for-your-plant\"><\/span>How to Choose a Risk Assessment Tool for Your Plant<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Auswahl zwischen <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>risk assessment tools<\/strong><\/a> is not mainly about feature count. It is about fit: the method must match your plant\u2019s hazards, and the software or template must match how work is actually reviewed, approved, and closed out. If you already understand the main types of risk assessment methods and the basics of using a risk matrix in manufacturing, the next step is evaluating whether a tool can support consistent execution across shifts, departments, and sites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A practical evaluation checklist should cover six areas: usability, mobile access, customization, approval routing, audit trails, and reporting. You should also test each option against plant complexity, site count, frontline participation, documentation requirements, and follow-up workload. That turns \u201chow to choose a risk assessment tool\u201d from a generic software search into an operations decision with measurable criteria.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-95-1.png\" alt=\"Framework for choosing risk assessment tools in manufacturing based on usability, mobile access, customization, approvals, audit trails, and reporting\" class=\"wp-image-8750\" srcset=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-95-1.png 1536w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-95-1-300x200.png 300w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-95-1-1024x683.png 1024w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-95-1-768x512.png 768w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/image-95-1-18x12.png 18w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"match-the-tool-to-process-complexity\"><\/span>Match the Tool to Process Complexity<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Simple hazards do not always need complex systems. A single-site metal fabrication shop doing routine task assessments may work well with a structured digital checklist and a built-in scoring matrix, while a semiconductor plant assessing maintenance permits, chemical exposure, and contractor work needs stronger controls and branching logic. The more variables, approvals, and conditional controls involved, the less suitable static spreadsheets become.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Also consider whether you use one method or several. Some plants rely mostly on matrix-based assessments, while others need What-If reviews for process changes and Bowtie-style analysis for major-loss scenarios. The right tool should support your primary method well and allow supporting formats without forcing teams into a one-size-fits-all template.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"check-usability-for-frontline-participation\"><\/span>Check Usability for Frontline Participation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If supervisors and operators cannot complete an assessment quickly, completion rates drop and data quality suffers. Good <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>risk assessment tools<\/strong><\/a> make scoring intuitive, reduce free-text where possible, and guide users through required fields in the right sequence. In practice, a packaging line leader should be able to log a guarding hazard during a shift walk in minutes, not wait to re-enter notes at a desktop later.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ease of use matters even more in multilingual environments common across Southeast Asian plants. Clear labels, simple scoring scales, and low training requirements improve adoption across direct labor, maintenance, and EHS teams. A tool that only works for specialists will not scale across daily operations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"evaluate-mobile-access-and-offline-reality\"><\/span>Evaluate Mobile Access and Offline Reality<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Many assessments happen beside machines, in warehouses, on loading bays, or in utility areas with weak connectivity. Mobile access is therefore not optional for most manufacturing environments. If the tool cannot capture photos, signatures, location details, and risk scores on the shop floor, teams will fall back to paper and delayed data entry.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For multi-building or multi-site manufacturers, offline capability and synchronized updates are especially important. A food processor with three plants may accept different local workarounds if the system is unreliable, which weakens standardization. Test real plant conditions before rollout, not just browser demos in a meeting room.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"review-customization-governance-and-follow-up\"><\/span>Review Customization, Governance, and Follow-Up<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Risk assessments rarely end at scoring. High-risk findings often trigger engineering review, temporary controls, retraining, or management approval, so the tool must support follow-through as well as capture. Look for configurable forms, role-based permissions, approval routing, due dates, reminders, and status tracking tied to each action.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Auditability is equally important. During an <strong><a href=\"https:\/\/www.jodoo.com\/blog\/iso-45001-manufacturing-guide\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\">ISO 45001<\/a><\/strong> audit or incident investigation, you may need to show who assessed the hazard, who approved controls, what changed, and whether actions were completed on time. Reporting should then help managers compare open high-risk items by area, site, owner, or overdue status so the assessment process drives decisions instead of producing static records.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"from-static-forms-to-actionable-workflows-where-jodoo-fits\"><\/span>From Static Forms to Actionable Workflows: Where <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\">Jodoo<\/a> Fits<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"why-basic-tools-break-down-at-scale\"><\/span>Why Basic Tools Break Down at Scale<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Spreadsheets, PDFs, and simple checklist apps can capture hazards, but they struggle once risk assessment becomes a cross-functional process. In a multi-line plant, different supervisors often use different scoring rules, file names, and review steps, which makes comparison difficult and follow-up inconsistent. That creates a practical gap between knowing the risk score and actually reducing the risk. For teams already comparing types of risk assessment methods and deciding how to choose a risk assessment tool, this is usually the point where data capture alone stops being enough.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A common example is a machine guarding assessment after a tooling change on a stamping line. The supervisor records severity and likelihood in a spreadsheet, emails it to maintenance, and waits for confirmation that the guard modification is complete. If the email is missed or the file is saved locally, EHS has no reliable view of open high-risk items, overdue actions, or recurring hazards by area. The assessment exists, but accountability is weak.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"how-jodoo-turns-assessments-into-controlled-workflows\"><\/span>How Jodoo Turns Assessments Into Controlled Workflows<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>Jodoo<\/strong><\/a> is built for this next step: standardizing the assessment logic and connecting it directly to action. Safety teams can create custom digital forms that reflect their own risk matrix, required control fields, photo evidence, signatures, and plant-specific categories such as confined space, lifting, chemical exposure, or contractor work. Risk scores can be calculated automatically based on the severity and likelihood scales your plant already uses, so frontline staff do not need to score manually or interpret formulas differently. That is especially useful when using a risk matrix in manufacturing across multiple departments or sites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the stamping-line example, the supervisor completes the assessment on a phone or tablet at the machine, selects the guarding hazard, and enters the current condition. Jodoo calculates the score instantly, applies the preconfigured threshold, and routes the record based on risk level. A medium-risk item might go to the area engineer for planned correction, while a high-risk item can trigger immediate escalation to production, maintenance, and EHS. The same logic can also require temporary controls before the line restarts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The workflow does not stop at submission. Once the assessment is filed, <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>Jodoo<\/strong><\/a> can assign corrective actions, set deadlines, send reminders, collect approval records, and track whether the mitigation actually reduced the residual risk. Managers can see which high-risk items are still open, which departments miss deadlines, and which hazard types appear most often after changeovers. That closes the loop between assessment and execution, which static files rarely do well.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"534\" src=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/9-1-1024x534.png\" alt=\"\" class=\"wp-image-8857\" srcset=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/9-1-1024x534.png 1024w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/9-1-300x156.png 300w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/9-1-768x401.png 768w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/9-1-1536x801.png 1536w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/9-1-2048x1068.png 2048w, https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/07\/9-1-18x9.png 18w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"what-this-looks-like-in-daily-plant-operations\"><\/span>What This Looks Like in Daily Plant Operations<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Weil <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>Jodoo<\/strong><\/a> is no-code, safety and operations teams can adapt the process without waiting for a software development cycle. If your plant changes the scoring bands, adds a second approval for shutdown-related hazards, or wants separate workflows for contractors and employees, the form and routing logic can be updated directly. This matters in real factories, where risk processes evolve with new equipment, customer audits, and incident learnings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The platform also supports stronger governance than generic forms. You can control who can submit, review, approve, or close an assessment, keep a full history of score changes and comments, and generate dashboards for open actions by line, site, or risk category. So if you are evaluating not only the main risk assessment methods but also the system that supports them, Jodoo fits where standardization, traceability, and follow-through matter most.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"conclusion-build-a-safer-more-scalable-risk-assessment-process\"><\/span>Conclusion: Build a Safer, More Scalable Risk Assessment Process<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Der beste <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>risk assessment tools<\/strong><\/a> are not always the most complex ones. In manufacturing, the right choice depends on the hazard, the decision required, and how quickly your team needs to act. A risk matrix works well for routine shop floor hazards, while methods like Bowtie, What-If, and FMEA help when processes, failure paths, or consequences become more complex. What matters most is using a method your teams can apply consistently across shifts, lines, and sites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That consistency is what turns assessment into prevention. When severity and likelihood scales are standardized, supervisors can compare risks more objectively, EHS teams can prioritize controls faster, and plant leaders can see where exposure is increasing before incidents occur. According to ISO 45001 principles, risk assessment should support action, not become a paperwork exercise.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If your current process still relies on spreadsheets, paper forms, or disconnected checklists, follow-up often becomes the weak point. <a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\"><strong>Jodoo<\/strong><\/a>, a no-code lean manufacturing platform, helps manufacturers digitize risk assessments, standardize approvals, and automate corrective action workflows without heavy IT effort. If you want a more scalable way to manage risk across your plant, you can <strong><a href=\"https:\/\/app.jodoo.com\/register\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\">Kostenlose Testversion starten<\/a><\/strong> oder <strong><a href=\"https:\/\/www.jodoo.com\/request-trial\/?utm_source=blog&amp;utm_medium=internal_link&amp;utm_campaign=lean&amp;utm_content=risk-assessment-tools-manufacturing\">Demo buchen<\/a><\/strong> to see how it fits your operations.<\/p>","protected":false},"excerpt":{"rendered":"<p>Compare risk assessment tools for manufacturing and learn how to score hazards faster. See how Jodoo streamlines safety workflows. Start a free trial.<\/p>","protected":false},"author":1,"featured_media":7857,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-8636","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solutions"],"blocksy_meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them - Jodoo Blog<\/title>\n<meta name=\"description\" content=\"Compare risk assessment tools for manufacturing and learn how to score hazards faster. See how Jodoo streamlines safety workflows. Start a free trial.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.jodoo.com\/blog\/de-de\/risk-assessment-tools-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them - Jodoo Blog\" \/>\n<meta property=\"og:description\" content=\"Compare risk assessment tools for manufacturing and learn how to score hazards faster. See how Jodoo streamlines safety workflows. Start a free trial.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.jodoo.com\/blog\/de-de\/risk-assessment-tools-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"Jodoo Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/company.jodoo\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-27T03:07:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T08:39:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/06\/\u6570\u5b57\u5316\u8f6c\u578b-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"464\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jodoo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@JodooHQ\" \/>\n<meta name=\"twitter:site\" content=\"@JodooHQ\" \/>\n<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jodoo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data2\" content=\"14\u00a0Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing\"},\"author\":{\"name\":\"Jodoo\",\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/#\\\/schema\\\/person\\\/b958cef486b1eb00d0f82e6f0a294481\"},\"headline\":\"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them\",\"datePublished\":\"2026-07-27T03:07:15+00:00\",\"dateModified\":\"2026-07-27T08:39:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing\"},\"wordCount\":2785,\"image\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/\u6570\u5b57\u5316\u8f6c\u578b-2.png\",\"articleSection\":[\"Solutions\"],\"inLanguage\":\"de\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing\",\"url\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing\",\"name\":\"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them - Jodoo Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/\u6570\u5b57\u5316\u8f6c\u578b-2.png\",\"datePublished\":\"2026-07-27T03:07:15+00:00\",\"dateModified\":\"2026-07-27T08:39:21+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/#\\\/schema\\\/person\\\/b958cef486b1eb00d0f82e6f0a294481\"},\"description\":\"Compare risk assessment tools for manufacturing and learn how to score hazards faster. See how Jodoo streamlines safety workflows. Start a free trial.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing#breadcrumb\"},\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing#primaryimage\",\"url\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/\u6570\u5b57\u5316\u8f6c\u578b-2.png\",\"contentUrl\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/\u6570\u5b57\u5316\u8f6c\u578b-2.png\",\"width\":768,\"height\":464},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/risk-assessment-tools-manufacturing#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.jodoo.com\\\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/\",\"name\":\"Jodoo Blog\",\"description\":\"Get the latest information about no-code development, updates, events, and other news about Jodoo.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/#\\\/schema\\\/person\\\/b958cef486b1eb00d0f82e6f0a294481\",\"name\":\"Jodoo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/250e0d43b77e764b8fd961bf41dc0e46963912235f6724430a4fdb771e857168?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/250e0d43b77e764b8fd961bf41dc0e46963912235f6724430a4fdb771e857168?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/250e0d43b77e764b8fd961bf41dc0e46963912235f6724430a4fdb771e857168?s=96&d=mm&r=g\",\"caption\":\"Jodoo\"},\"sameAs\":[\"http:\\\/\\\/wp.sre.jodoodevelop.com\"],\"url\":\"https:\\\/\\\/www.jodoo.com\\\/blog\\\/de-de\\\/author\\\/wp-admin\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them - Jodoo Blog","description":"Compare risk assessment tools for manufacturing and learn how to score hazards faster. See how Jodoo streamlines safety workflows. Start a free trial.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.jodoo.com\/blog\/de-de\/risk-assessment-tools-manufacturing\/","og_locale":"de_DE","og_type":"article","og_title":"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them - Jodoo Blog","og_description":"Compare risk assessment tools for manufacturing and learn how to score hazards faster. See how Jodoo streamlines safety workflows. Start a free trial.","og_url":"https:\/\/www.jodoo.com\/blog\/de-de\/risk-assessment-tools-manufacturing\/","og_site_name":"Jodoo Blog","article_publisher":"https:\/\/www.facebook.com\/company.jodoo","article_published_time":"2026-07-27T03:07:15+00:00","article_modified_time":"2026-07-27T08:39:21+00:00","og_image":[{"width":768,"height":464,"url":"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/06\/\u6570\u5b57\u5316\u8f6c\u578b-2.png","type":"image\/png"}],"author":"Jodoo","twitter_card":"summary_large_image","twitter_creator":"@JodooHQ","twitter_site":"@JodooHQ","twitter_misc":{"Verfasst von":"Jodoo","Gesch\u00e4tzte Lesezeit":"14\u00a0Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing#article","isPartOf":{"@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing"},"author":{"name":"Jodoo","@id":"https:\/\/www.jodoo.com\/blog\/#\/schema\/person\/b958cef486b1eb00d0f82e6f0a294481"},"headline":"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them","datePublished":"2026-07-27T03:07:15+00:00","dateModified":"2026-07-27T08:39:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing"},"wordCount":2785,"image":{"@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing#primaryimage"},"thumbnailUrl":"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/06\/\u6570\u5b57\u5316\u8f6c\u578b-2.png","articleSection":["Solutions"],"inLanguage":"de"},{"@type":"WebPage","@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing","url":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing","name":"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them - Jodoo Blog","isPartOf":{"@id":"https:\/\/www.jodoo.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing#primaryimage"},"image":{"@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing#primaryimage"},"thumbnailUrl":"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/06\/\u6570\u5b57\u5316\u8f6c\u578b-2.png","datePublished":"2026-07-27T03:07:15+00:00","dateModified":"2026-07-27T08:39:21+00:00","author":{"@id":"https:\/\/www.jodoo.com\/blog\/#\/schema\/person\/b958cef486b1eb00d0f82e6f0a294481"},"description":"Compare risk assessment tools for manufacturing and learn how to score hazards faster. See how Jodoo streamlines safety workflows. Start a free trial.","breadcrumb":{"@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing#breadcrumb"},"inLanguage":"de","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing"]}]},{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing#primaryimage","url":"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/06\/\u6570\u5b57\u5316\u8f6c\u578b-2.png","contentUrl":"https:\/\/www.jodoo.com\/blog\/wp-content\/uploads\/2026\/06\/\u6570\u5b57\u5316\u8f6c\u578b-2.png","width":768,"height":464},{"@type":"BreadcrumbList","@id":"https:\/\/www.jodoo.com\/blog\/risk-assessment-tools-manufacturing#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.jodoo.com\/blog"},{"@type":"ListItem","position":2,"name":"Top Risk Assessment Tools for Manufacturing: How to Choose and Use Them"}]},{"@type":"WebSite","@id":"https:\/\/www.jodoo.com\/blog\/#website","url":"https:\/\/www.jodoo.com\/blog\/","name":"Jodoo Blog","description":"Erhalten Sie die neuesten Informationen zu No-Code-Entwicklung, Updates, Veranstaltungen und anderen Neuigkeiten rund um Jodoo.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.jodoo.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de"},{"@type":"Person","@id":"https:\/\/www.jodoo.com\/blog\/#\/schema\/person\/b958cef486b1eb00d0f82e6f0a294481","name":"Jodoo","image":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/secure.gravatar.com\/avatar\/250e0d43b77e764b8fd961bf41dc0e46963912235f6724430a4fdb771e857168?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/250e0d43b77e764b8fd961bf41dc0e46963912235f6724430a4fdb771e857168?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/250e0d43b77e764b8fd961bf41dc0e46963912235f6724430a4fdb771e857168?s=96&d=mm&r=g","caption":"Jodoo"},"sameAs":["http:\/\/wp.sre.jodoodevelop.com"],"url":"https:\/\/www.jodoo.com\/blog\/de-de\/author\/wp-admin"}]}},"_links":{"self":[{"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/posts\/8636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/comments?post=8636"}],"version-history":[{"count":4,"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/posts\/8636\/revisions"}],"predecessor-version":[{"id":8858,"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/posts\/8636\/revisions\/8858"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/media\/7857"}],"wp:attachment":[{"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/media?parent=8636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/categories?post=8636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jodoo.com\/blog\/de-de\/wp-json\/wp\/v2\/tags?post=8636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}