Use this checklist to decide what each JSA and PTW checkpoint should capture, who owns it, and which evidence or status keeps the work traceable.
CheckpointWhat stays visibleRule or ownerEvidence or status
JSA planningWork type, job steps, hazards, control measures, PPE, residual risk, location, crew, and attachments.Applicant or job owner prepares; supervisor or safety owner reviews.JSA draft, returned, approved, or revised status.
PTW applicationJSA number, permit number, job type, validity period, area, scope, controls, and required approvers.Configured PTW rules and approval matrix.Permit submitted, returned, approved, or rejected status.
Multi-role approvalApplicant, supervisor, EHS officer, area owner, and permit issuer decisions.Each role signs the same digital record.Electronic signature, identity, timestamp, comments, and decision history.
Pre-work verificationJSA-identified pre-work controls and prerequisites, such as gas test, LOTO, isolation, toolbox talk, PPE check, equipment inspection, and emergency plan.JSA/PTW activation rules set by the EHS team.Pass/fail result, evidence, owner, confirmation time, and missing-item blocker.
QR activationUnique work permit QR code, activation time, worksite context, and active work permit status.Authorized worker, supervisor, or permit issuer activates on site.Activated, active, suspended, warning, stop-work, or expired status.
Execution monitoringReal-time observations, photos, Safe / Warning / Stop Work states, status changes, and work pause reasons.Field owner, supervisor, EHS officer, or area owner review.Cloud-synced work permit status, alerts, dashboard view, and action owner.
Closeout and archiveWork Completed, Final Inspection, Remove Isolation, Close Permit, and Archive Records sequence.Final inspector, area owner, and permit issuer close the record.Final inspection proof, isolation removal confirmation, closeout comments, archive package, and audit trail.
Hazard control feedbackCloseout findings, residual hazards, repeat controls, corrective actions, and updated job templates.Safety owner or EHS manager reviews for improvement.Hazard register entry, JSA template update, corrective action, dashboard trend, or training follow-up.