Construction fleet management software

Construction fleet software for vehicles and equipment

Connect project demand, unit allocation, operator readiness, pre-start checks, worked and idle time, fuel, transfers, downtime, and release decisions without losing the record behind the status.

Jodoo manages the project-facing workflow and human decisions. It does not replace equipment telemetry, GPS, OEM diagnostics, or regulated operator systems.

Start with Jodoo’s Free plan for up to five users. No credit card required.

  • Project and fleet teams share the same current unit, site, operator, and release state
  • Operators complete pre-start checks and attach defect evidence from mobile
  • Supervisors open allocation, transfer, idle, downtime, and stop-use records behind the dashboard
Mixed-fleet decisions

Allocate the right unit without losing sight of hire cost or service needs

Road vehicles, owned equipment and hired machines share a project, but they do not share the same operating limits.

Fleet situationCheck before committingUseful action

Hired excavator approaching off-hire

Remaining work, hire end date, transport booking, return condition and daily hire charge.

For example, three unused days at $240/day add $720 before transport. Extend or release the hire deliberately; this is an example, not a market rate.

Machine close to its service interval

Current engine hours, next service reading and expected hours for the next work package.

A unit at 480 hours with service due at 500 has only 20 hours remaining. Schedule service or allocate another unit if the job needs more.

Truck and excavator on one project

Mileage for the truck, engine hours for the excavator, operator qualification and site restrictions.

Keep units and inspection questions distinct. Do not combine kilometres and engine hours into one utilization number.

Transfer after a failed pre-start

Defect severity, release decision, action owner and the receiving site’s need.

Resolve the hold before releasing the machine. A transfer booking is not a safety clearance.

Project-to-project control

Make allocation and release decisions with current evidence

The next project needs more than the current location: it needs a reliable release date and confirmation that the unit is ready for work.

Demand

Request a unit for a work package

Identify project, site, date, asset class, task, operator requirement, and expected duration.

Allocate

Choose an available and ready unit

Check current project, planned release, document health, inspection state, service position, and open constraint.

Mobilize

Confirm site and operator handoff

Record receiving site, operator, meter, condition, attachments, and acceptance.

Operate

Capture pre-start and daily use

Record worked hours, idle time, fuel, condition, downtime reason, and supporting evidence.

Transfer or release

Make the next project decision

Confirm receiving site, release condition, service need, transport, owner, and due date.

Exceptions that change the plan

Get each fleet problem to the team that can resolve it

See which unit is affected, what the project will lose and who needs to act before reallocating equipment.

01

Stop-use defect

Hold the unit, preserve inspection evidence, notify fleet and site supervision, and decide repair or replacement.

02

Release date moves

Show both projects the revised date, reason, impact, transfer requirement, and accountable owner.

03

Idle unit

Compare planned demand, actual worked hours, idle reason, next project need, and cost before reallocating.

04

Operator not ready

Route expired or missing qualification to the supervisor before the unit is issued.

05

Downtime during work

Connect the unit, project, time lost, cause, workaround, maintenance handoff, and expected return.

Different roles need different views

Use one record model without giving everyone the same screen

Permissions and views should follow the decision each role owns.

RoleWorking viewDecision

Fleet manager

Unit readiness, allocation, documents, inspections, transfers, service position, and constraints.

Release, hold, reallocate, or send to maintenance.

Project manager

Units assigned, planned release, worked and idle hours, downtime, and incoming transfers.

Confirm demand, impact, workaround, or revised release.

Site supervisor

Today’s units, operators, pre-start exceptions, stop-use items, and due actions.

Allow work, stop use, or escalate.

Operator

Assigned unit, mobile pre-start, meter, fuel, condition, and immediate issue report.

Accept custody and report current evidence.

Maintenance owner

Failed checks and downtime records sent from the project workflow.

Plan repair and verify return to service.

What needs specialist equipment software

Coordinate project work in Jodoo and connect specialist equipment data

Manual operating records and automated machine data serve different purposes.

QuestionUse Jodoo to manageUse specialist systems to manage

Project workflow

Demand, allocation, approval, site handoff, operator record, inspection evidence, transfer, downtime response, and release.

Live equipment location, geofencing, automated engine hours, fault codes, remote diagnostics, or theft recovery.

Business change

Different project fields, asset classes, site checks, decision routes, permissions, and client reporting.

OEM-specific machine data, certified operator compliance, or equipment finance and rental billing.

Shared picture

Bring essential specialist signals into the project workflow through available integrations.

Keep the original telemetry or OEM platform as the authoritative machine source.

Construction fleet questions

Build the workflow around project reliability

Road vehicles and heavy equipment need different checks, usage measures, and service schedules. Choose a workflow that keeps those differences clear.

What should construction fleet software manage?

Manage units, asset classes, projects, sites, operators, demand, allocation, inspections, service position, fuel, utilization updates, idle and downtime reasons, transfers, documents, costs, and release decisions.

Can it manage both vehicles and heavy equipment?

Yes, with different required fields, checklists, operating units, and views. Do not force a passenger vehicle, excavator, and trailer through one identical form.

Does the example calculate utilization from telematics?

No. The example uses manually reported meter, worked-hour, and idle-hour records. Automated utilization requires an appropriate telematics or OEM integration.

Can operators complete pre-start checks on mobile?

Yes. The form supports condition choices, defect severity, evidence, release decision, action owner, and due date.

How does it connect to maintenance?

A failed check or downtime record creates a clear handoff with unit, site, severity, evidence, and impact. A focused maintenance workflow should manage work orders, parts, labor, and return-to-service verification.

Can each project have different fields?

Yes. A trained administrator can adapt forms, choices, views, permissions, rules, and dashboards for different project or asset requirements while preserving shared fleet records.

Test the difficult handoff

Resolve a vehicle hold before the next project

Try a failed pre-start check in the sample app. Review the hold and required action before planning the unit’s next assignment.

Open the Jodoo fleet application