Company and worker
Contractor company, person, contact, sponsor, role, and the visit or work reference.
Keep contractor company, work scope, sponsor, induction, permit, PPE, evidence, approved area, escort, arrival, onsite status, exception, exit, and closeout connected.
A contractor is not just a guest with a company name. The visit must prove readiness for a defined job and area, then retain the site handoff and exit.
Each item needs a source, current state, owner, and review path.
Contractor company, person, contact, sponsor, role, and the visit or work reference.
Defined task, site, work area, schedule, expected duration, and restrictions.
Required induction or qualification, completion result, validity, and evidence reference.
Permit type, owner, status, validity, and the exact activity or area it covers.
Required PPE, readiness result, brought equipment, and any corrective action.
Site host or escort, arrival, current area, expected exit, actual exit, pass return, and unresolved follow-up.
A red status is useful only when the record says what is missing and who can resolve it.
| Exception | Owner | Allowed response |
|---|---|---|
| Induction incomplete | Contractor manager or site coordinator | Complete, reschedule, or deny according to policy |
| Permit missing or invalid | Permit owner | Correct and approve before access to the work area |
| PPE not ready | Site host or safety coordinator | Issue, correct, restrict, or stop |
| Sponsor or escort unavailable | Site host manager | Assign alternate, wait, reschedule, or deny |
| Requested area differs from approval | Access owner | Review scope and update or reject the request |
| Exit overdue | Site host | Confirm location, work status, pass return, and exit |
Keep specialist contractor, safety, permit, and access systems when their dedicated controls are required.
The need is configurable readiness requests, evidence, approval, arrival, host or escort, area, exceptions, dashboards, and closeout.
Company prequalification, workforce competency, training content, credential expiry, insurance, and supplier compliance define the program.
Native work permits, isolations, control-of-work, credentials, readers, and security decisions are required.
A contractor visit connects to a company, work scope, sponsor, area, schedule, induction, permit, PPE, evidence, escort, onsite status, exception, and closeout.
Yes. Put induction, permit, PPE, evidence, sponsor, area, and approval states on the request and show unresolved items in the expected-arrival view.
Yes. Attach or reference the evidence required by the process, then restrict role access and define retention. Specialist credential validation may require another system.
Not when native control-of-work, isolation, gas testing, competency, permit lifecycle, and specialist safety controls are required. Jodoo can coordinate surrounding requests and exceptions.
Keep an active site visit with expected exit, host or escort, current area, pass or badge, unresolved issue, actual exit, return evidence, and closeout state.
Run incomplete induction, missing permit, PPE issue, unavailable sponsor, changed work area, overdue exit, and closeout evidence.