Inspection finding
Keep the failed condition, location, severity, interim control, corrective scope, owner, due date, and required reinspection connected to the turnover.
Turn move-out into a shared readiness plan with room-level cleaning and repair tasks, utilities and safety, keys, evidence, blockers, final walk, and release.
A working checklist and readiness board for property teams. Adapt every item to the property, lease, local requirements, and the people qualified to verify it.
Free for up to five users. No credit card required.
Adapt fields, workflows, and dashboards without code. Explore 1,000+ app templates and use cases
Explore the sample records before you copy the app. Add real tenant, access, vendor, and property information only in your own secured workspace.
Each line needs an owner, expected condition, evidence, due date, blocker, and effect on release. The exact list varies by property and jurisdiction.
Record the property, building, unit, move-out date, target ready date, coordinator, occupancy context, access and key status, known damage, scheduled inspection, and who receives the unit after release.
Walk the unit systematically, preserve photos and observations, distinguish ordinary wear from damage according to policy and law, create scoped work orders, and identify any safety or utility condition that blocks access or occupancy.
Keep cleaning, paint, flooring, appliances, plumbing, electrical, HVAC, pest work, utilities, keys, access devices, and vendor appointments visible with owners and targets. Do not hide a blocked trade behind a percentage complete.
Verify all blocking work, utilities and safety, cleanliness, keys, evidence, open observations, cost status, and downstream handoff. Record ready, held for correction, or released with the person and time behind the decision.
One visible hold gives the leasing or operations team a truthful answer and tells the coordinator what must happen next.
Keep the failed condition, location, severity, interim control, corrective scope, owner, due date, and required reinspection connected to the turnover.
Show the exact trade, work order, missing part, vendor commitment, cost approval, and expected recovery date. Replan the ready date openly instead of silently missing it.
Record the room or item returned, the expected standard, evidence, responsible team, recheck time, and whether other work may proceed.
Block release when required utilities, detectors, locks, keys, access devices, or a safety condition are unresolved. Your controlled checklist defines the actual requirement.
Adapt the controlled criteria, but do not release the unit while a required condition is unknown.
| Readiness area | Evidence | Release question |
|---|---|---|
| Condition inspection | Completed observations, photos and linked findings | Have all blocking findings been corrected and verified? |
| Cleaning and repairs | Completion records, returned work and final check | Does the unit meet the agreed handoff condition? |
| Utilities and safety | Required tests, services and competent verification | Are utilities and required safety conditions ready? |
| Keys and access | Count, lock/access-device status and handoff | Can the next authorized occupant enter securely? |
| Final release | Decision owner, time, notes and downstream handoff | Who accepted the unit and what remains as non-blocking work? |
A shorter turn is valuable only when the unit is safe, complete, documented, and accepted.
Measure from move-out and inspection to accepted readiness, separating waiting-for-access, vendor, parts, approval, repair, cleaning, utility, and verification time.
Track the working estimate, approved changes, actual turnover cost, and accounting reference. Use consistent categories so management can compare units without turning the checklist into a ledger.
Monitor units returned after final walk, cleaning rework, failed reinspection, and defects reported soon after occupancy. This exposes rushed or unclear finish conditions.
Compare repair categories, repeated appliances or fixtures, building age, prior work, inspection findings, and cost patterns to decide preventive maintenance or capital review.
Property teams can add or revise unit-specific work while preserving shared readiness states and management reporting.
A connected turnover app can be built in hours and a focused checklist or routing change can often be made in tens of minutes.Add a room, appliance, utility, key, safety, or evidence requirement.
Show specialist follow-up only when a finding or property type needs it.
Route held units or high-cost changes to the right decision owner.
Add a dashboard for ready-date risk, cost, returns, or recurring repairs.
Jodoo connects the checklist to inspection findings, work orders, costs, evidence, holds, and release without claiming one universal property standard.
Apartments, long-stay rooms, offices, retail suites, student housing, and managed homes may need different rooms, trades, evidence, and downstream handoffs.
Connect the unit and relevant references, but keep deposits, charges, invoices, rent, lease status, marketing, and applicant decisions in the systems and policies that own them.
The checklist coordinates the evidence and release decision. It does not replace regulated tests, licensed trades, professional inspections, legal advice, or local habitability requirements.
Typical areas include planning, move-out condition inspection, photos, cleaning, repairs, paint and flooring, appliances, plumbing, electrical and HVAC, utilities and safety, keys and access devices, cost, final walk, evidence, holds, and release. Adapt the list to the unit and local obligations.
Ready means the agreed inspection and checklist indicate the unit can move forward. Released records the accountable final handoff to leasing, operations, housekeeping, or the next responsible team. Some organizations combine the decisions; others keep them separate.
Yes. Link each material finding to a scoped work order with an owner, target, cost state, blocker, evidence, and verification. Keep the turnover held until every required repair and reinspection is accepted.
The page explains the checklist, but the Jodoo app is designed for live ownership, evidence, changing due dates, linked work, and a readiness board. If you export or print, define how updates and the final decision return to the shared turnover record.
No. The workspace can store condition and work evidence, but deposits, responsibility, charges, notices, ordinary wear, local law, lease terms, and dispute handling require your accountable policy and specialist systems.
Review planned, blocked, final-inspection, ready, and released units with the exact inspection, cleaning, repair, utility, key, cost, and hold context behind them.
Open the unit turnover app