Warranty item
Project, building, location, asset or system, defect category, description, impact, reported date, and evidence.
Track post-handover defects by project, location, asset, trade, warranty period, subcontractor, site visit, repair, evidence, and owner acceptance.
Construction warranty work begins after practical completion but still depends on project records, handover packages, trade responsibility, access, site evidence, repair coordination, and formal sign-off.
The workflow should preserve the contractual and physical context while giving occupants, owner teams, contractors, and trades a clear next step.
Capture project, handover package, building and exact location, asset or system, defect, date, photos, impact, and reporter.
Is the issue clear, urgent, and within the relevant warranty period?Check handover record, warranty end, trade package, subcontractor, prior repair, exclusion, and required specialist input.
Who owns investigation and correction?Assign visit, coordinate occupant or site access, define repair scope, due date, safety need, and materials or trade dependencies.
What must happen on site and what can block it?Record completed repair, photos, test or commissioning evidence, reviewer, owner response, and acceptance.
Is the defect genuinely closed or does it need rework?Post-handover teams need more context than a generic service ticket.
Project, building, location, asset or system, defect category, description, impact, reported date, and evidence.
Handover package, warranty start and end, contractor, subcontractor, trade, exclusion, and decision.
Access contact, appointment, technician or trade, scope, materials, safety, blocker, work completed, and photos.
Inspection result, test, consultant or owner reviewer, rework, sign-off, and closure date.
Warranty delay often comes from access and responsibility ambiguity rather than the repair itself.
Exact location, issue, impact, availability, photos, and contact.
Coverage decision, responsible scope, evidence, site contact, access, due date, and expected proof.
Visit record, completed work, materials, test, photos, remaining risk, and readiness for inspection.
Acceptance recommendation, evidence, rework need, closure date, and record update.
One average closure time can hide the cause of warranty backlog.
Elapsed time from complete report to assigned contractor, trade, or internal owner.
Find contract and triage ambiguity.Open items with responsibility confirmed but site access or appointment not secured.
Coordinate occupants and contractors before due dates slip.Elapsed time from reported completion to verified owner or consultant sign-off.
Prevent completed work from remaining administratively open.Closed items reopened or new items linked to the same location, asset, trade, or failure.
Identify weak repairs and recurring quality problems.Keep authoritative drawings, BIM, contracts, project controls, and financial transactions in specialist systems when needed; connect the people and evidence required to close warranty work.
Owner or contractor teams need a focused, mobile-friendly, adaptable post-handover defect and repair workflow.
Warranty work must remain inside the project’s native drawing, submittal, RFI, punch, contract, and document environment.
The issue has transitioned into ongoing maintenance, work orders, assets, and service-level management.
It tracks project and handover context, exact location or asset, defect, warranty period, responsible contractor or trade, site access, visit, repair, evidence, review, rework, and owner acceptance.
A punch-list item is usually identified before or around handover. A warranty item arises after handover and needs coverage, responsibility, access, repair, and owner-acceptance context.
Yes. Teams can use mobile-ready forms to capture location, status, notes, photos, dates, and sign-off. Test the exact mobile experience before rollout.
Move or link the issue when it becomes ongoing maintenance rather than a contractor warranty obligation. Keep the original coverage and closeout history connected.
Use the Jodoo construction warranty workspace to test project context, mobile evidence, trade handoffs, access, repair verification, and owner sign-off.