Visual production scheduling

Production scheduling software the shop floor can trust

Turn approved production into a visible schedule by work center and shift, then preserve the reason, impact, decision, and acknowledgement when the sequence changes.

This is a human-controlled schedule workspace. Manufacturers needing algorithmic finite scheduling should verify APS constraints and optimization separately.

Free for up to five users. No credit card required.

Adapt fields, workflows, and dashboards without code. Explore 1,000+ app templates and use cases

  • Work-center and shift sequence
  • Readiness and due risk beside every slot
  • Controlled rescheduling with floor acknowledgement
A schedule the floor can use

Show more than a date on a production order

A workable slot carries enough context for the scheduler and supervisor to understand what should run next and what could prevent it.

  • Where and when

    Work center, line, shift, schedule date, planned start, planned finish, and sequence.

  • What is running

    Production order, product, quantity, operation, route or setup family, and priority.

  • Can it start

    Material, tooling, document, quality, labor, and preceding-operation readiness.

  • Who can change it

    Scheduler, floor owner, decision owner, change reason, acknowledgement, and current schedule status.

When the sequence changes

Treat rescheduling as an operating decision, not a silent drag-and-drop

The schedule must move quickly without erasing the tradeoff.

  • Trigger

    A rush order arrives

    Capture requested date, priority, affected customer promise, and who requested the change.

  • Impact

    The scheduler tests the slot

    Review material readiness, work-center load, setup family, downstream orders, and likely delay.

  • Decision

    Approve the new sequence

    Retain the original and proposed slots, reason, approver, and affected commitments.

  • Handoff

    The floor acknowledges

    Supervisors confirm the new sequence so the published schedule and actual work do not diverge.

Signals before dispatch

Make risk visible before the planned start

Use schedule measures to decide what to resolve, not merely to report lateness after it happens.

  • Ready-to-run coverage

    Released slots with material, tooling, document, and quality readiness confirmed before the freeze window.

    Open the missing readiness item and owner.
  • Work-center load

    Planned hours compared with the available working window for each center and shift.

    Use as a review signal unless a validated APS engine calculates capacity.
  • Unacknowledged changes

    Published changes not yet confirmed by the responsible floor team.

    Escalate before the original sequence is executed.
  • Promise risk

    Slots whose change, readiness gap, or preceding delay threatens a committed date.

    Trace the signal to the affected order.
Choose the scheduling model

Match software depth to the constraint that drives your schedule

Not every shop needs finite optimization, and not every shop can be managed with a visual board alone.

Scheduling needWhen a configurable board can fitWhen to consider a specialist scheduler

Priority sequencing

People choose the tradeoff and need a clear history of schedule changes

Hundreds of operations must be optimized continuously

Capacity awareness

Load is reviewed at work-center or shift level

Skills, tools, alternate routes, calendars, and setup constraints must calculate exact slots

Material readiness

ERP/MRP supplies a readiness result for human decision

The scheduler must recalculate material plans and purchasing automatically

Floor dispatch

Supervisors acknowledge and execute a published queue

Machine integration and real-time dispatch are core requirements

Production scheduling questions

Publish a schedule that remains explainable when it changes

Scheduling quality depends on both the slot and the decision trail.

What does production scheduling software do?

It assigns released work to times, sequences, shifts, work centers, or resources and helps teams respond when readiness, priority, or capacity changes.

Is a visual schedule the same as APS?

No. A visual board supports human sequencing and change control. APS software can apply finite capacity, calendars, alternate resources, setup matrices, and optimization rules to calculate schedules.

Can Jodoo prevent unapproved schedule changes?

A workflow can require a reason, approval, impact record, and floor acknowledgement before a proposed change becomes published.

Can the schedule connect to ERP or MES?

Yes, subject to integration design. Decide which system owns orders and actual events, how identifiers map, how often data synchronizes, and which system resolves conflicts.

Put the schedule in context

Connect every scheduled slot to readiness and shop-floor feedback

See how materials, equipment, quality, labor, progress, and urgent changes affect the executable sequence and its downstream commitments.

Explore the scheduling and tracking workflow
Test the change, not only the happy path

Reschedule one representative order end to end

Use the populated app to change a slot, retain the impact and approval, and confirm that the floor can see and acknowledge the new sequence.

Open the scheduling app