Check that the right material arrived, inspect it against the right requirement, and keep anything unresolved visible. Start with an editable form that shows the checks each item requires.

Free for up to five users. No credit card required.

Adapt fields, workflows, and dashboards without code. Explore 1,000+ app templates and use cases

Sign in to explore the sample App. Install it with sample data to assign your team and try the review tasks.

Start with the delivery identity

Do these checks before interpreting measurements. A good reading against the wrong drawing—or a certificate for a different supplier lot—does not establish that the received material is acceptable.

CheckRecord or compareIf it does not match
Supplier and orderSupplier, purchase order and expected item.Clarify the delivery before recording acceptance.
Item and revisionItem code, drawing or approved requirement, and revision.Hold the decision until the applicable requirement is confirmed.
Lot and quantitySupplier lot, internal lot reference and received quantity.Identify mixed lots or discrepancies; do not hide them in a comment.
Packaging and identityLabels, visible damage and packaging condition.Describe the affected material and retain supporting evidence.
Required documentsCertificate identity and whether it matches this lot.Record the missing or mismatched document and request it.
Inspection responsibilityInspector, date, sample quantity and assigned reviewer.Make the next action explicit rather than leaving an unsigned Pass.

Then show only the checks that apply to the item

Machined bracket

For BRK-220, the example selects revision C and shows the 9.90–10.10 mm limits. Enter a sample identifier, reading and observation for each measured piece. The form counts out-of-limit readings and retains the underlying values.

A 10.14 mm reading fails the dimensional check. Changing the visual result to Pass cannot make that measurement conform.

Printed packaging

For LBL-041, the requirement is packaging-only. The measurement table and dimensional limits disappear. The inspector can concentrate on the selected item’s identity, visual condition and required documents.

Adapt the form with your actual artwork, print or label requirements before using it. The example does not claim to inspect those characteristics automatically.

This is where a configurable form helps: choices, required fields and conditional sections can reflect the material family. Keep your approved inspection criteria separate from casual changes to a checklist.

Make a failed or incomplete check actionable

  1. Describe the specific discrepancy

    “Sample S2 measured 10.14 mm against an upper limit of 10.10 mm” is useful. “Quality issue” is not. For a missing certificate, identify the required document and the received lot rather than entering a generic failure.

  2. Keep the affected lot under control

    Record the finding, evidence reference and reviewer. Follow your physical segregation procedure. The form does not move stock or prevent warehouse transactions by itself.

  3. Submit the inspection for review

    The native task sends the result to the assigned reviewer. Confirming a passing inspection creates a basis for a separate lot decision; it is not permission to release material.

  4. Retest without erasing the first result

    If material is corrected, create a new retest linked to the original report and describe the correction. Use the inspection report template when you need to share those readings and conclusions.

Set up the checklist before the next delivery

Install the example, replace the fictional items and requirements, and assign receiving, inspection and review responsibilities. Auto-numbered records identify requirements, lots and inspections; staff should not have to invent unique IDs for every submission. Use controlled choices for inspection type and result, numeric fields for quantities and readings, and member fields for the people who must act.

Test one dimensional item and one packaging-only item. Check both the sections that appear and those that disappear. Then try a missing certificate and an out-of-limit reading before treating the form as ready for operational use.

Plan the receiving fields, responsibilities and release rules if your team is moving from an existing paper or Excel checklist.

From completed checks to a controlled decision

Receiving checklist questions

Should the same checklist be used for every delivery?

Keep a common arrival check for supplier, order, item, lot and quantity. Add the checks that matter for the purchased item. A machined part may need dimensional readings; printed packaging may need identity, artwork and condition checks instead. Avoid forcing irrelevant measurements into every receipt.

What should an inspector do if a certificate is missing?

Identify the affected lot, record the missing document and keep the material awaiting a quality decision. Passing dimensions alone should not turn a required but missing certificate into a pass. The example calculates a Hold result for this situation.

Can this checklist cover several dimensions on one part?

The included dimensional example records one characteristic per requirement, with individual readings for the sampled pieces. A multi-characteristic plan needs additional measurement definitions and release checks before use. Keep the applicable limits and individual values; a failure count alone does not explain what failed.

How do I record a check that does not apply?

Use an explicit not-applicable choice only when your approved requirement permits it. In the example, packaging-only requirements hide dimensional rows, and certificate requirements determine whether a missing certificate prevents a passing result.

Can receiving staff approve their own inspection?

The App separates inspection submission from the assigned quality-review task. Configure the installed workspace’s members and permissions to match your segregation-of-duties policy. Review those role assignments before using the App for operational decisions.